Action Wall Ties - Specialists in masonry repair and reinforcement
Home
|
Commercial Clients
|
Domestic Clients
|
Resource Centre
About Us
|
How We Work
|
Contact Us
tel:
01227 721255
general
navigation
About Us
How We Work
Contact Us
Commercial Clients
Domestic Clients
Resource Centre
Site Map
site
map
Home
About Us
How We Work
Contact Us
Commercial Clients
Street Housing - Solid Brickwork
Bowed Wall - Case Study
Lintel Repair - Case Study
Stabilisation of Superstructure of a Rear Addition - Case Study
Superstructure Reinforcement After Underpinning - Case Study
Bay Windows, Lintel Repair & Bowing Wall - Case Study
Square Bay Window - Case Study
Stabilisation- Edwardian Portico Stucco Columns - Case Study
Bay Window Bowing brickwork piers & dropping arches - Case Study
Edwardian Round Bay Window -cracking & dropping brickwork arches - Case Study
Bay Window generic repair - Generic Repair
Street Housing - Cavity Wall
Cavity wall construction history - Case Study
Corroded Mild Steel Ties - Case Study
Wall Tie Treatment & Weather Struck Re-Pointing - Case Study
Wall Tie Treatment & Cavity Cleaning - Case Study
Bowing Gable Wall - Case Study
Failing Lintels & Localised Subsidence - Case Study
Wall Tie Treatment - Generic Repair
Bridged Cavities - Cavity Cleaning - Generic Repair
Low Rise Blocks 1930s-1950s
Balustrade Walls (half-brick thick) to access deck & private balconies - Case Study
Remedial Expansion Joints to solid construction - Case Study
Corroding Support Angle to Flat Brick Soldier Course Lintel - Case Study
Corroding mild steel balusters cracking masonryto balustrade walls (half-brick thick) - Case Study
Remedial Restraint posts to walkway balustrade walls - Case Study
Remedial Expansion Joints - Generic Repair
Contemporary Buildings (Modern Unframed)
Extensive Cracking in large expanse of Brickwork - Case Study
Defects to Balustrade Wall on Walkways & Balconies - Case Study
Cracking to Brickwork façade- with short wall returns - expansion joints - Case Study
Boot Lintels Fixing Cracking above Concrete Boot Lintels - Generic Repair
Bridged Cavities - Cavity Cleaning - Generic Repair
High Rise Concrete Frame Buildings
Concrete Frame Shortening Effect - Case Study
Re-tie, brick slip fixing, introduction of remedial expansion joints - Case Study
Bowing brickwork and brick slips due to concrete frame shortening - Case Study
Wall ties bi-metallic corrosion - Case Study
Concrete Toe Reinforcement & Re-Tie Infill Walls - Case Study
High Rise Blocks - Large Panel System (LPS)
Pre-Ronan Point - Enfield, Four Blocks - Case Study
Pre-Ronan Point - Bow, Two Blocks - Case Study
Post-Ronan Point Thamsmead - Case Study
Post-Ronan Point Case Study Islington - Case Study
Buildings of Major Importance
Spa Green Estate - Case Study
East Ham Town Hall - Case Study
Madingley Hall - Case Study
Kings School, Canterbury - Case Study
Cintec Sock Anchors
East Ham Town Hall - Case Study
Madingley Hall - Case Study
Historic dockyard Chatham The Smithery - Case Study
Stabilising Victorian gable wall -stone corbels, pediment & copings - Case Study
AWT developed unique techniques
AWT developed unique drilling techniques - Generic Repair
Cutting Expansion Movement Crack-inducement Joints - Generic Repair
Remedial Structural Metal Works - Generic Repair
Domestic Clients
Solid Wall Constructed Housing
Bowed Wall - Case Study
Lintel Repair - Case Study
BayWindow - Case Study
Bay Windows Lintel Repair & Bowing Wall - Case Study
Superstructure Reinforcement After Underpinning - Case Study
Stabilisation of Superstructure of a Rear Addition - Case Study
Victorian Window brickwork arch defects repairs - Case Study
Bay Window - Generic Repair
Cavity Wall Constructed Housing
Cavity Wall Construction History - Case Study
Corroded Mild Steel Ties - Case Study
Wall Tie Treatment & Weather Struck Re-pointing - Case Study
Wall Tie Treatment & Cavity Cleaning - Case Study
Bowing Gable Wall - Case Study
Failing Lintels & Localised Subsidence - Case Study
Wall Tie Treatment - Generic Repair
Bridged Cavities Cavity Cleaning - Generic Repair
Resource Centre