SolutionThe AWT Remedial scheme involved the introduction of
bed joint reinforcement, lateral restraints and resin bonded ties,
adding tensile strength and thus reinstating the brickwork’s integrity
and the uniformity of the wall. After installation, pointing was raked
out, reinstated and tinted to match the existing (see coloured remedial
works on our proposal picture).
1. Bed joint reinforcement: Introduced two rows of twin cord reinforcement, forming a deep masonry beam –
Indicated by red double dotted lines on our proposal images.2. Lateral restraints:
In conjunction with the beam, 8mm stainless steel lateral restraints
were introduced and screwed directly into timber floor joists’ end
grain or into the side grain, all resin bonded to the masonry –
Indicated with yellow stars on our proposal images.3. Wall ties to de-bonding brickwork:
Wherever possible to the centre of a brick, drilled for and resin
bonded new 6mm stainless steel remedial ties. Re-pointed disturbed
areas only with coloured sand and cement mixture –
Indicated with blue lines on our proposal images.