Solution• AWT completed a remedial scheme providing a
viable repair by introducing remedial wall ties, isolating the existing
ties and cavity cleaning.
• Wall tie treatment: Our
operatives installed remedial wall tie treatments to the front, right
side and rear elevations in accordance with AWT’s Wall tie treatment –
Generic repair.
• Cavity cleaning: We cleaned the cavities to
the ground floor DPC at the front, right side and rear elevations in
accordance with our specifications and AWT’s methods. This meant the
removal of sufficient external brickwork to enable the removal of
discarded mortar debris, leaving the cavity clear to below the DPC
while at all times maintaining the integrity of the wall.