SolutionThe AWT Remedial scheme involved the introduction of bed joint reinforcement, lateral restraints and resin bonded ties, adding tensile strength and thus reinstating the brickwork’s integrity and the uniformity of the wall. After installation, pointing was raked out, reinstated and tinted to match the existing (see coloured remedial works on our proposal picture).
1. Bed joint reinforcement: Introduced two rows of twin cord reinforcement, forming a deep masonry beam –
Indicated by red double dotted lines on our proposal images.2. Lateral restraints: In conjunction with the beam, 8mm stainless steel lateral restraints were introduced and screwed directly into timber floor joists’ end grain or into the side grain, all resin bonded to the masonry –
Indicated with yellow stars on our proposal images.3. Wall ties to de-bonding brickwork: Wherever possible to the centre of a brick, drill for and resin bond new 6mm stainless steel remedial ties. Re-point disturbed areas only with coloured sand and cement mixture –
Indicated with blue lines on our proposal images.