SolutionThe bay window was tied back to the main elevation using stainless steel bed joint reinforcement. This served also to beam up the brickwork and repair the cracking. In addition, the bay was tied back to the two floors behind to provide proper lateral restraint. The arch was pinned up, using stainless steel pins, and resined into the brickwork above. After installation, pointing was raked out, reinstated and tinted to match the existing (see coloured remedial works on our proposal picture).
Arboricultural works were undertaken on the tree (by others), to reduce the crown and accordingly lower its water demand from the underlying clay.