Discussion
• Wall ties: AWT opinion, based on the Building Research Establishment’s recommendations, was that the symptoms / defects noted were consistent on all elevations requiring remedial work. It was considered that the building would benefit from remedial wall tie replacement and the isolation of the existing ties.
• Bridging of cavities at DPC: The bridging of the DPC had rendered it ineffective and could result in rising damp.
Solution• AWT completed a remedial scheme providing a viable repair by introducing remedial wall ties, isolating the existing ties and cavity cleaning.
• Wall tie treatment: AWT operatives completed remedial wall tie treatments to the front, right side and rear elevations in accordance with AWT’s Wall tie treatment – Generic repair.