Problem 1. The main entrance – Above the staircase and to the left side of the entrance cracking was noted between the internal junction of the external brickwork, the dividing wall and the corner of the ceiling above.
2. The floor slab and ceiling – Cracking was noted to the 150mm floor slab that was found to be of a clinker rich material.
3. There were no signs of significant cracking to brickwork, although the movement noted was considered likely to be progressive. It was apparent that the outer brickwork was bowing outward de-bonding from the dividing walls and had become unconnected and cracking the divding walls and floor slab all reducing the restraining to the facade.